DOB permits
Most NYC construction work beyond ordinary repairs needs a DOB permit, filed by a licensed professional and closed with a sign-off.
Work that needs a permit
Structural work, moving or removing walls, new plumbing or gas lines, electrical changes, facade repairs, mechanical systems, demolition, and any change of use or occupancy need a permit. Painting, plastering, new flooring, and minor like-for-like repairs are ordinary repairs and do not. If it is unclear, a registered architect or engineer can confirm before work starts.
Filing types
DOB sorts permit applications by the type of job.
| Filing | Used for |
|---|---|
| New Building (NB) | Ground-up construction |
| Alteration CO (Alt-CO) | Major work that changes use, egress, or occupancy, ending in a new or amended certificate of occupancy |
| Alteration (Alt) | Renovations that don't change the certificate of occupancy; the usual filing for apartment and storefront work |
| Limited Alteration (LAA) | Small plumbing, sprinkler, or oil-burner jobs filed by a licensed trade |
| Demolition (DM) | Full or partial demolition |
The permit process
A registered architect or engineer prepares the plans and files them in DOB NOW. A plan examiner reviews them, and most jobs receive at least one round of objections before approval. The licensed contractor then pulls the work permit and posts it on site. The job is complete when it passes final inspection and DOB signs it off. A job left open on the record can come up later, for example during a sale or refinance.
Work without a permit
Work without a permit can result in a civil penalty, an ECB violation with an OATH hearing, and a stop-work order. The permit still has to be filed afterward.
What Formin does
When a violation's correction needs permitted work, Formin's resolution plan lists the filing, approval, work, inspection, and sign-off in order, shows which tasks depend on others, and assigns each one to you, your engineer, or your contractor. Drawings, approvals, and sign-off documents stay attached to the violation.
Formin doesn't file or pull permits. It organizes the permit steps a violation needs so your architect, engineer, and contractor can move faster. Requirements and fees depend on the work and the building; your design professional and DOB's fee schedule confirm what applies.
Plan the permitted work a violation needs.
Add a building to get resolution plans that put filing, work, inspection, and sign-off in order.