Formin for architects
Formin connects each violation's cited code and conditions to the repair scope, contractor proposals, and sign-offs.
Defining the scope
The inspector's description is brief, and the cited code section is detailed. The repair scope has to satisfy both and be specific enough for contractors to price consistently.
Sign-offs
A correction is complete when the responsible professional certifies it and the agency accepts the filing.
What Formin handles
Each violation's record, scope, proposals, and sign-offs in one case.
| What you need | How Formin does it |
|---|---|
| Review cited conditions | The cited code and inspector notes for each violation |
| Define repair scopes | A shared scope every contractor prices against |
| Coordinate corrections | Tasks in order, from protective measures to repairs |
| Compare contractor proposals | Side by side, with what each one includes and excludes |
| Share plans and documents | Drawings, photos, and reports attached to the violation |
| Track sign-offs | Every certification through to the certificate of correction |
Official resources
Formin is independent of NYC agencies; the summons and the official record govern.
Keep the scope with the violation.
Add a building to keep cited conditions, scopes, and sign-offs with each violation.